The Hilton Garden Inn was a great project for MDSI to showcase our Mind Blowing Performance. There were 643 Series 20 panels on this job totaling just shy of 15,000 square feet, and there were zero panel remakes for our customer. It was wrapped up in October of 2017 in Iowa City, IA using Alpolic Cow White on the 6th through 12th floor, entry canopies, and parking garage sky walk, and then Alpolic Mica MNC Clear on the 12th floor penthouse restaurant.
The challenge for this project will continue to reinforce the Mind Blowing Performance that is part of our mission statement. The timing of our scope was very specific without wiggle room. Because of the height of the building our customer had to use special equipment throughout the install. Metal Design Systems, Inc. met all of their deadlines to keep their customer’s schedule on track which then helps keep the whole project schedule on track. MDSI is proud to have been a part of this great project.